翻訳と辞書
Words near each other
・ Novosil
・ Novosilske
・ Novosilski Bay
・ Novosilski Glacier
・ Novosilsky
・ Novosilsky District
・ Novosinkovo
・ Novosiolovca
・ Novoslobidka
・ Novoslobodskaya
・ Novosokolnichesky District
・ Novosokolniki
・ Novospasovka
・ Novospassky
・ Novospassky (inhabited locality)
Novospassky Bridge
・ Novospassky District
・ Novospassky Monastery
・ Novosphingobium
・ Novosphingobium pentaromativorans
・ Novosti
・ Novosti (Croatia)
・ Novosti a.d.
・ Novosti Kazakhstana
・ Novosti Uzbekistana
・ Novosvitlivka refugee convoy attack
・ Novosvitlivka, Luhansk Oblast
・ Novosyolovo
・ Novosyolovsky
・ Novosyolovsky District


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Novospassky Bridge : ウィキペディア英語版
Novospassky Bridge

Novospassky Bridge ((ロシア語:Новоспасский Мост)) is a steel plate girder bridge that spans Moskva River, connecting Novospassky Monastery and Paveletsky rail terminal areas in Moscow, Russia (about 3 kilometers south-east from the Kremlin). It was built in 1911, as a triple-span steel arch bridge. Reconstruction in 2000 replaced arches with a simpler plate girder structure.〔Russian: Носарев В.А., Скрябина, Т.А., "Мосты Москвы", М, "Вече", 2004, стр.66 (''Bridges of Moscow'', 2004, p.66) ISBN 5-9533-0183-9〕 Note that the memorial plaque on the bridge spells its name ''Ново-Спасский'', with dash, despite tradition and spelling rules.
==History==

Wooden bridges at the site of fortified Novospassky monastery existed since 16th century. The last wooden causeway was demolished in 1910.
In 1911, the city builds a triple span arched bridge, similar to other pre-revolutionary Moscow bridges. Spans were 40.54+46.99+40.54 meters long, 21.2 meter wide (4 lanes including two tram lines). Each span was supported by 14 arches, 3.7 meter high for middle span, 3.3 meter high for side spans. Steel deck was paved with 13 centimeter thick timbers.
In 1937-1938, the bridge was reconstructed to the design by Yu.F.Werner (structural engineering), N.B.Sokolov and Yakovlev brothers (architectural design). They raised the deck by 2.7 meters, which increased water clearance 8.6 meters high, 30 meters wide (for heavy barge traffic after completion of Moscow Canal). This also enabled separating embankment and bridge traffic in two levels (street-level throughways under main deck), total length with ramps reached 502 meters. Timber pavement was replaced with concrete and asphalt.〔''Bridges of Moscow'', 2004, p.67〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Novospassky Bridge」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.